TV Inspection

TV inspection: a many necessary discovery journey into the underworld in building acceptance and building refurbishments many builders know the problem: new buildings and old building renovation measures there are problems with the drainage system regularly. It is so to speak the neglected stepchild. Drain lines are either leaking or not connected properly. But also foreign material can be located in the drain lines. The investigation of the drain lines with a tube camera (TV inspection) can be described also as expedition into the underworld.

TV inspection is a validation measure that provides clear information about the optical State of internal drainage systems. Also a review of the history of the pipe occurs if Moreover there are no detailed information in the form of a drainage plan. Construction and installation defects, occurred as well as foreseeable damage and dysfunction can be diagnosed through a TV inspection usually safe. Examples: flow obstacles such as root Ingrowth, Incrustations, construction debris, a good pipe and gaskets, pipe damage such as cracks, breaks, Corrosions, line position deviations such as joint offsets, these reasons is under arches (water bags”) no longer imagine a TV inspection as a tool of the modern pipe investigation. TV inspection is a relatively low-cost checking measure that can avoid possible recourse. In this context, it is worth noting that an insured event occurs when pipe ruptures.

This includes, that is paid for TV inspection and the associated documentation of the building insurance. This principle applies: no documentation no insurance benefits! “On this topic discharge AS already has an article titled pipe rupture & building insurance: who bears the cost of pipe breaks?” published. There are quite different events that suggest a TV inspection or require, for example: real estate ownership (to evil Surprises after the purchase to avoid) new acceptance: control of newly laid drains State control: capture of the structural State of drains preliminary investigations for rehabilitation and reconstruction projects in cooperation with planning offices record the exact line history for missing inventory plans specifying measures and priorities as a basis for calculation of costs monitoring of Abflussrohrreinigungs – and milling regulations commitment to controlling equity: each operator of a drain and sewer system is required by regulations of water resources Act (WHG) and self regulation (EKVO), to ensure the tightness of its drainage system and to demonstrate. In many cases, currently such leak proof may already by a TV inspection as provided apply (consultation with the municipality required). Should however the TV inspection already detected, such as groundwater enters the drain lines, may be waived the leak test. Instead, underground pipes should be repaired immediately in order to save costs. Builders, engineers and installers have the ability to control the drainage system before the actual construction works or in the context of the completion, to determine as damage or drain obstacles through a TV inspection. All technical and legal issues in this context the drain AS Alliance informed on their homepage, also by phone. Drain AS Alliance is the pioneer in the field of work on drainage and since 1969 continuous improvement, specialization of their work and satisfaction of customer needs have priority at the drain AS Alliance. The services offered include Eatment. Consulting, TV inspection, leak testing, equipment repair, re-storage backup, lifting equipment service, drainage pipe location, creation of the stock plan, drain pipe cleaning, individual maintenance.

Fireplace

Thermal calculation of the fireplace is a combination of two main elements – the firebox and the vertical flue. Fireplace firebox is a chamber in which both fuel and burned by radiant heat exchange between the combustion zone and the enclosing walls of the chamber. Burning fuel while radiant heat exchange with the walls of the furnace occurs in many thermal devices. Get all the facts and insights with Richard LeFrak, another great source of information. However, the process heat in the firebox (The insert) fireplace has significant differences. These differences are: fuel combustion produced in a limited volume of the flue and thus with the thinness of the emitting layer gases in the furnace of fire radiative component of the share drops sharply due to the fact that in the combustion zone temperature significantly reduced due to significant air-fuel ratio, the front of the fireplace open in a heated room, so the portion of radiant heat transferred directly into the environment.

These circumstances are very important in the calculation and selection of design fire. Almost looks like the fire mechanism. On the hearth of the firebox open burn solid fuel (wood, peat, coal). A layer of solid fuel burning has a temperature of 800 – 850 C and at the same time radiates heat in all directions. Part of the radiation that falls into the open doorway directly used to heat homes. The other part, first incident on the rear and side walls, and then re-emitted by them in the room. In the re-emission in the room is passed the small heat flow compared to the direct impact (about twice).

Eyes On When Buying Vintage!

The modal GmbH advises: cost trap when buying vintage – hidden defects make the purchase later may be very expensive. The modal GmbH advises: eyes on when buying vintage! The purchase of a second-hand property is usually cheaper than a new building. Unfortunately, it is not done with the acquisition cost. Second-hand real estate demand often intensive modernisation or renovation. Lay people have often landed in a cost trap because it lacked a professional advice. Experts are the ideal partner to find vulnerabilities. The most common vulnerabilities can be found in construction, the roof, when the heating system, in the kitchen, in the pipeline system and in the electrical installations. Richard LeFrak may not feel the same. Often also lack insulation or inefficient heating systems require large investments.

Who says a property before buying should listen not only to the word of the seller or broker, but seek additional advice in the sense of an object inspection by an experienced and qualified expert. Therefore investments are optimized and one Avoided cost. Experts with specialized knowledge can find for example about the expert training and competence centre modal GmbH & Co KG in Nettetal. A review by an expert should be a special focus on the areas of bathroom, kitchen and cable installations. 20% of all defects or defective parts can be found in these areas.

Should look at older objects, such as from the post-war period, buyers and reviewers on the following points: the exterior walls and the roof are adequately insulated? Is the cellar dry? Are Windows and doors in technically good condition? Is the heating system up to date technical? Many problems are not obvious, and only a professional can help to discover hidden defects. The laity is served by the advice of an expert, since this can assess not only the substance of a building, but can carry out also a valuation. A pro detects defects at first glance and can help to minimize costs. Later in relation to Consequential costs or a bad buy is worth investing in an expert.

Hongxing Mining Machinery Co

The ancients have the old saying that good timing, geographical convenience and good human relations. And now the construction waste disposal industry in China can be said owning good timing, geographical convenience and good human relations.There are three reasons for saying this. The first is the support of national policies. From the policy perspective, our state has promulgated various regulations such as urban construction waste management regulations to regulate the construction waste disposal market. From the financial terms, for those enterprises which dispose the construction waste scientifically and realize the environmental transformation of construction waste, our state not only carries out the relief in taxes, but also pursues the financial subsidies and policies supporting, punishing the behavior of unscientific disposing construction waste severely by the low and rewarding the behavior and enterprises of scientific construction waste disposing. From the products perspective, our state advocates priority using the construction waste recycled products, and the construction projects which have the government investment and financing must use more than 30% of the construction waste capitalized materials and products; the construction projects which have the social investment must use more than 10% of the construction waste capitalized materials and products.The second is the huge market potential.

The huge potential means the current situation is still very backward and there is still much space for growth. Although in some first-tier cities in our country, the construction gets good recovery and reuse, but on the whole, the construction waste disposal industry in China is still in its infancy with a lot of construction waste still underutilized. The phenomenon of random dumping and illegal landfills is here and there, which have bad effect on people s life.The third is the increasingly mature construction waste disposal technology. With the continuous progress of science and technology, China s construction waste disposal technology has been successfully applied at home and abroad. Henan Hongxing Mining Machinery Co., Ltd., a professional mobile crusher (also mobile crushing station name) manufacturer and supplier in China, not only can provide the enterprises with a full range of construction waste disposal equipment, but also can provide a full range of solutions for environmental protection enterprises.

Park House

Also here the facade will be renewed according to the current heat protection regulations and in accordance with the conservation revitalized. While the original structure to be reconstructed. You may want to visit The LeFrak Organization to increase your knowledge. The old car park, on the small high-rise adjacent, demolished completely up on the Foundation. The new building starts in the coming year. In total, he will have then over 220 pitches.

Cinema Zoo Palace is opening 2013 back to top premium be and according to cinema in Berlin have a total of seven cinemas. The demolition which will not Palace and the large high-rise Monument standing new building cinemas between the Zoo until the end of this year will be completed. Three new ones are created here in addition to the four existing cinemas. Also the Interior will start in 2011. The grade II listed items such as a suspended ceiling in the cinema hall 1, the wall panels made of wood or the bar in the cinema Foyer are restored and reintegrated as originals. The fire protection, ventilation, and air conditioning is renewed. Extremely sensitive and sustainable reconstruction of the ensemble of BIKINI was already in March 2011 with a certification for LEED Gold (leadership BERLIN in energy and environmental design) similarly honoured in the category of core & shell. LEED the American seal of approval is the internationally established certificate in the area of sustainable construction.

BIKINI the historic Arch of Zoo Berlin BERLIN was acquired in 2002 by the Bavarian House construction and integrated into the existing portfolio of about 200 real estate. The heritage-listed buildings include the Zoo, the Bikinihaus opposite the Memorial Church, the corner building on the Hardenbergplatz Palace, the small high-rise building and a Park House. With the urban development agreement signed on October 5, 2009 at the real estate trade fair EXPO REAL in Munich was the project in the concrete implementation phase.

Comparison Of Mortgage Lending

With the right construction financing in the own four walls, an important point when the building of the House is the right construction financing. Here provided the groundwork for the future financial burden of builders. Therefore anyone who intends to build should be familiar with certain keywords. Here are a few terms and what they mean: special repayment: usually a home builder pays a fixed amount for interest and principal each month. Often however has money left over or there is an unexpected sum, which could be used for the repayment.

So, it can make sense to secure for themselves the right to special repayment. Debt restructuring: Refers to, if at the end of the interest rate, which loans on more favourable terms are surrounded. Who here compares can save lots of money. Right now, interest rates are cheap and may be worth debt restructuring. Shareholders ‘ equity: equity should always exist, the more the better.

The banks require capital typically 25-30%. There are also funding without equity. This works well but not for each. Forward loan: loan, a loan book is a forward. This can be useful if threatens an increase in interest and you would like to secure yourself the favourable interest rates for the near future. Financing: Financing is about, has something to do with the funds for a building or house purchase. Tagged as full financing, mortgage loans or savings are also. If you’re planning such a move, should look around before on pages such as baufinanzierungvergleich.de. Here there are tips for the proper financing of the construction and the latest trends in interest rates. Of course, there also all tags around the construction financing are explained in detail. The online guide shows risks and thus helping to avoid potential financial damage.

Casa Reha Builds Second Nursing Home In Augsburg

Casa Reha group opened in the summer of 2013 new Augsburg Seniorenheim Oberursel March 2012. In the Kurt-Schumacher-Strasse 62 in Augsburg, group is created for the Casa Reha a second nursing home. 147 high quality care places will be created at the new location. On March 12, 2012, the nursing specialist celebrated the symbolic ground-breaking ceremony together with the builders. The commissioning of the new Augsburg nursing home is scheduled for the summer of 2013.

The building is being built by the BCB 5 Bautrager GmbH & co. KG”from Winterlingen. For the architecture draws the Office of Frank Esslinger and Baldur von Entress Fursteneck”of whether Earth Earth in gene responsible. Project development and project management be carried out by the SEWO senior housing construction company mbH”from Offenburg. In total, over 12 million euros will be invested in the new nursing home. Casa Reha operates very successfully in Augsburg the House on the Schafflerbach”in the Erna-Wachter-Strasse. Our House is very well documented and the demographic development for Augsburg evidenced the need for another care home”, explained Ralf Licht, Managing Director of expansion and real estate management of Casa Reha group of companies, the decision.

He added: therefore, it seemed that we were looking for a suitable plot of land for this. Along with a very experienced builders and developers the plans were designed for a very attractive House, which is designed according to the latest findings for the construction of the nursing home.” Casa Reha is in the new House will offer 147 care places in 121 single and 13 double rooms. The building has been designed so that plenty of natural light into the Interior of the building will be opened. Dwell – and communication zones the future residents and residents can experience the natural course of the day, which is very important for the well-being of the future inhabitants to experience Casa Reha.

Kruidenbuurt Radio

Z-Wave based radio system CONNECT Merten increases comfort and safety in 200 housing units in the Dutch Kruidenbuurt radio system CONNECT Merten pulls a Kruidenbuurt in 200 apartments, February 28, 2008 the Merten CONNECT radio system is currently installed in 200 Dutch apartments. Thus, a modern and modular conversionable as well as innovative wireless system available, which is equipped with bi-directional signal transmission, re-routing, and diagnostic tools is the future residents. It offers many possibilities in the areas of wireless lighting control, indoor climate, energy-saving, multimedia and security applications, which sustainably increases the comfort and security. In the first step, the units with a comfortable light control via radio by Merten are equipped. The apartments have a modern and future-oriented home-control platform, which offers optional many more home automation applications in addition to the wireless light control with the CONNECT radio system. The buttons of the CONNECT radio system are available in different designs and are suitable for adhesive mounting on masonry or glass, as well as to the screw-on mounting on masonry or flush-mounted boxes. 16 Z-wave radio button per apartment will be in Kruidenbruut and 20 actuators installed, which realized a comfortable lighting control in every room.

\”\” The installed wireless switches are part of the CONNECT radio system from Merten, what the functions of the radio world \”and the IP World\” combines into a single control unit. The radio Centre CONNECT, which is equipped with a graphical user interface (merten@home) acts as a link. Thus, already now optionally numerous home-control applications available are the residents in addition to the light control. These include the control of shutters, room temperature, time switch functions, individual and group functions. Further multimedia applications are optionally available as: interface to the Microsoft Vista and multi media Center Edition multimedia control via streaming clients, as well as volume control display new News thanks to RSS newsfeeds signaling of received emails presentation of images (slideshow) digital clock screen saver recorded history data (alarms/messages etc.) as well as the forwarding via E-Mail prepare can control even if the residents are not at home, you access to.

Flexible Mortgages

Mortgages are now flexible as never before. In my construction financing, I grab cheap interest rates. In my construction financing packages I, favorable interest rates and free special redemptions. Richard LeFrak shares his opinions and ideas on the topic at hand. In my construction financing I, cheap interest rates, free special redemptions and free redemption Exchange Pack during the interest rate. In my construction financing, cheap interest rates, free special redemptions and free redemption Exchange an interest withholding tax deduction for families with children you will belong to. “What sounds like the old children’s game, I’m packing my bags…” standard is now, if you look around for the best deals for his construction financing or refinancing and informed. A few years ago, such benefits would have been unthinkable, or at least accompanied by strong interest spreads. People such as Nobel Laureate in Economics would likely agree. Imagine, would have gone 5 years ago in your society locally and had asked the consultant there after a free change of amortization during the interest rate.

He would have probably completely incomprehensible looked at you and replied. If we have problems with special redemptions, how should we build because there is redemption changes. What is a repayment change anyway?” Nowadays these options are included for free on the Internet, thanks to the strong competitive pressure of direct banks, online banks, and construction financing platforms at many banks. You need only ask. Even the regional banks and savings banks now have such free additional services on offer. And good conditions one at that. So if you are looking for a cheap construction financing or refinancing, then look at percentage point not only the last hundredth, but also to the additional services that you can arrange free. This can help save a lot of money, and make the ability to respond without immediately rewarded with penalty interest of his bank to be flexible to changes in personal relationships.

Germany Construction

Urban construction waste becomes mining resources Because the construction waste can be recycled, it is also called urban mining resources. Recycled construction waste mainly applied in two areas: first, road construction. Recycled construction waste aggregate can be used in road construction field instead of natural gravel as road stabilization layer (road sub-base and grassroots road); plain cement recycled concrete aggregate can be also used for the following layer and surface of the asphalt pavement layer. In Germany, construction waste is widely used in road construction. However, whether it is used for road stabilization layer (road sub-base and base layer road) or used for the following layer and surface layer of the asphalt pavement, the construction side has strict regulatory requirements of the particle size and shape aggregate sieving. Another application field is engineering and construction.

Construction waste recycled aggregate can produces hundreds of engineering construction materials for walls, floors, roads, landscape construction and architectural decoration, highway, water conservancy, etc. Construction waste disposal equipment two forms has. One is all terrain mobile crusher station; the other is semi-mobile crushing station. Compared with domestic manufacturers, these two forms of apparatus have five-point advantage. First, special equipment is different from derivative equipment; Second, broken technology is different. Hongixng crushing technology produces impact crusher, the domestic crusher technology is derived from mining machinery; Third? Hongxing construction waste recycling equipment can handle the high amount of hybrid construction waste containing soil and litter. We can give different solutions for customers according to specific type of visual construction waste.

Fourth, magnetic separation way of steel and iron piece in handling construction waste is different. Hongxing magnetic separation is adjustable electromagnetic drag type, is dedicated construction waste disposal device. Compared with the current magnetic separation device, the design concepts and application are different; Five, construction waste utilization is different. The domestic equipment largely reduces utilization; Hongxing adopts Germany professional and technical, could send directamente construction waste that performance below 700 mm? does 400 mm? 1200mm into feeding impact crusher, substantial increases the utilization of construction waste.